Download Muse Dash v5.10.0 | MrPcGamer

Download Muse Dash v5.10.0

Go To Donwload

Game Details

Release name : Muse Dash v5.10.0

Size : 3.64 GB

 

Title : Muse Dash – Just as planned

Genre : Action, Casual, Indie

Developer : peropero

Publisher : hasuhasu

Store: click here

Release Date : 20 Jun, 2019

Screenshots

 

Gameplay

 

About This Game :

About This Content

[Just as Planned] DLC
Purchase [Just as Planned] to unlock a complete collection of music (now over 300 songs), characters, elfins, welcome screens, and illustrations!
On top of that, future updates on Muse Dash will be unlocked for free ✓
That’s to say, after purchasing [Just as Planned], there’s no need to pay for any further updates on Muse Dash (ゝ∀・) ~
Attention!
[Just as Planned] and music packs purchased
COULD NOT BE USED
across platforms. Before purchasing, please make sure that the platform is the frequently used one!
If you wish to play Muse Dash across multiple devices, you can log in to your bound account on the mobile device by going into “Options” → “Account” to sync your level and saved data, etc. (★-ω-)b
Privileges of [Just as Planned]
Default songs and some free illustrations can be unlocked through an upgrade.
Once you purchase [Just as Planned], you can enjoy a 1.5x EXP boost permanently!
Anyway, level-up 114514 first ⊂彡☆))∀`)!

 

System Requirements for Muse Dash – Just as planned Download Free

MINIMUM :

OS *: Windows 7 or later

Processor: Intel Core™ Duo or faster

Memory: 2 GB RAM

Graphics: DirectX® 9 Compatible Graphics Card

Storage: 1 GB available space

 

RECOMMENDED :

OS *: Windows 7, Windows 8, or Windows 10

Processor: Intel Core 2 Duo @ 2.00 GHz or equivalent

Memory: 4 GB RAM

Graphics: NVIDIA GeForce GTX750

Storage: 1 GB available space

 

How To Install Muse Dash – Just as planned Download Free

1. Download The Game.
2. Extract with WinRAR
3. Play!.

 

Download Muse Dash – Just as planned Download Free

Comments